Design, construction and installation of telecom sites
A full cycle of building telecommunications infrastructure: from foundation to equipment launch. We build reliable networks across Uzbekistan.
Main types of construction and installation works
Choose a type of work to see the detailed description
Turnkey construction of telecom sites
A full range of work from design to commissioning
Surveys and design
Geology, geodesy and development of design documentation in accordance with the standards of Uzbekistan.
Foundation works
Monolithic and pile foundations for telecom sites. Calculation of soil bearing capacity.
Steel structure assembly
Assembly and lifting of tower and mast sections. Use of mobile cranes and special machinery.
Power engineering
Construction of power lines, installation and sealing of metering devices.
Our capabilities in telecom site construction
In-house resources for fast project delivery

Experience in building telecom infrastructure
Extensive construction experience and a professional team. Projects in the mountain, desert and urban areas of Uzbekistan
We provide services in every region
Our team is mobile and ready to deliver projects anywhere in the country while maintaining uniform quality standards.
Licences for construction and installation works
A full package of permits for the design and construction of telecom sites in Uzbekistan.
Stages of telecom site construction
A transparent process from request to launch
Planning
1-2 daysDrawing up the nominal equipment placement plan and providing the coordinates of the proposed installation point for a preliminary assessment.
Site search
1-2 daysA visit to the site, inspection of the location and an assessment of the technical feasibility of the placement.
Approval of the placement point
5-7 daysPreparing and issuing technical specifications, agreeing the placement parameters and signing the contract.
Construction and electrical works
7-10 daysCarrying out construction and electrical installation works: site preparation, structure assembly and power connection.
Installation and launch
5-7 daysInstalling telecom equipment, configuring the system and commissioning the site.
Planning
1-2 daysDrawing up the nominal equipment placement plan and providing the coordinates of the proposed installation point for a preliminary assessment.
Site search
1-2 daysA visit to the site, inspection of the location and an assessment of the technical feasibility of the placement.
Approval of the placement point
5-7 daysPreparing and issuing technical specifications, agreeing the placement parameters and signing the contract.
Construction and electrical works
7-10 daysCarrying out construction and electrical installation works: site preparation, structure assembly and power connection.
Installation and launch
5-7 daysInstalling telecom equipment, configuring the system and commissioning the site.
Details on each infrastructure type

Construction of telecom lattice towers
Design and assembly of self-supporting lattice towers 18-72 m high. Steel structures with a triangular or square cross-section for urban and suburban areas.

Construction of telecom towers
Erection of high-rise tower structures 24-90 m tall for backbone networks and wide coverage. Reinforced foundations for multi-operator collocation.

Construction of telecom masts
Rental and placement of telecom equipment on compact structures for dense urban areas. Fast small-cell deployment.

Telecom equipment installation
Professional installation of telecom equipment: antenna systems, RRUs, base station cabinets, cable laying, power connection.
Along with equipment placement you can order:
End-to-end solutions for the full cycle of network deployment and maintenance
Design and construction
Turnkey construction of new AMS. From surveys to commissioning.
Power supply and redundancy
Grid connection, diesel generator installation, uninterruptible power systems.